Temporary Fence Rental in Pocatello
Signature Fencing offers temporary fence rental in Pocatello and Chubbuck, with 6- or 8-foot panels, pedestrian and vehicle gates, and optional screening. For work beside occupied buildings, show the entrances and shared routes that need to remain open.

Keep shared circulation visible on the drawing
Pocatello’s Planning and Development resources include maps and land-use applications. Chubbuck’s Planning Division addresses site-specific matters such as parking, landscaping and setbacks. Use the project’s actual jurisdiction and drawing to identify the area available for temporary fence, especially where construction shares a property with an existing use.
A pedestrian gate provides a different opening from the vehicle access used by deliveries or waste collection. Mark each gate’s purpose, required clearance and approach, then distinguish public or tenant routes outside the construction enclosure. If part of the property reopens early, show the fence segment to be moved or removed with that phase.
Define what remains open
- Parking and entrancesShow the parking or building access that remains outside the work zone. Include any approved temporary changes that affect the proposed fence line.
- Service accessIdentify delivery and waste-collection routes, gate widths and the space needed to turn. Note whether those movements occur during occupied hours.
- Return to useMark the portions that reopen before the project finishes. Give the expected rental duration and any planned reduction or relocation of the enclosure.
Useful details for your quote
- Project name and complete street address, city, state and ZIP.
- Rental duration in months; add a bid deadline if applicable.
- Approximate linear feet; use the measurement helper if needed.
- Gates, ground surfaces and delivery access.
- Required height, screening and project specifications.
Approximate linear feet, rental duration in months, and whether the job is prevailing wage (Yes or No) are required for a quote. Installation dates are optional.
Start with the right jurisdiction.
Check with the city or county that has jurisdiction over your site for permits and work near the street. These links are a starting point.
Project questions.
Can the fence separate one tenant’s work from shared parking?
Provide the tenant work limits and the property’s circulation plan. The team can review the requested boundary and gates without assuming permission to occupy shared space.
What if a gate must move halfway through the job?
Show both positions and the phase that triggers the change. A defined relocation can be discussed with the initial scope instead of being left as an unspecified future adjustment.
